Flip to reveal answersWhat four things do you record for every part?
Track your progress — Sign up free to save your progress and get smart review reminders based on spaced repetition.
All 4 Flashcards — Designing the system
Sign up free to track progress and get spaced-repetition review schedules.
Question
What four things do you record for every part?
Answer
Its material, the process that made it, how it joins to the next part, and why each was chosen.
Question
Why does the parts count matter?
Answer
It is the best single predictor of assembly time and cost. Fewer parts means fewer stations, less stock, fewer mistakes and usually lower impact.
Question
What is line balancing?
Answer
Grouping work so each station takes about the same time. One station at 90 seconds among others at 30 sets the whole line to 90 seconds per unit.
Question
Where should a test be placed?
Answer
Where the fault is cheapest to fix. Testing a board before it is sealed inside an enclosure costs minutes; afterwards it costs the whole product.
Read the notes
Full study notes for Designing the system
Topic 8.1 hub
Production systems
More from Topic 8.1
All flashcards in this topic
Design Technology exam skills
Paper structures & tips
Track your progress with spaced repetition
Sign up free — Aimnova tells you exactly which cards to review and when, so you remember everything before your IB exam.
Start Free