Name the six production systems.
Track your progress — Sign up free to save your progress and get smart review reminders based on spaced repetition.
All Flashcards in Topic 8.1
Below are all 24 flashcards for this topic. Sign up free to track your progress and get personalized review schedules.
8.1.14 cards
Name the six production systems.
Craft, mechanised, automated, assembly line, hybrid, and computer integrated manufacturing — in order from person to machine.
What is the difference between mechanised and automated?
In a mechanised system a person operates the machine for every part. In an automated one the machine runs itself and a person supervises.
How do you identify a production system from a product?
Ask how many are made, how identical they are, and how much judgement each needs. Many identical units with no judgement means an assembly line.
Why is the answer usually hybrid?
Real products have repetitive stages and judgement stages. Machines take the repetition; people take inspection, awkward assembly and final set-up.
8.1.24 cards
What does automation buy and cost?
It buys consistent quality, continuous running and a collapsing labour cost per part. It costs high capital, slow expensive changes, and bad parts made in bulk before a fault is noticed.
Give two disadvantages of an assembly line.
Repetitive demotivating work, and the whole line stopping if any one station does. It is also inflexible once laid out.
Why is a hybrid system so common?
Machines take the repetitive work and people take the judgement, so it copes with variation full automation cannot. The cost is two systems to balance.
What does CIM add beyond automation?
It links design, production, stock and quality into one system, so a design change flows straight to the machines and every part is traceable — and the plant depends entirely on that software.
8.1.34 cards
Name the five scales of production.
One-off, batch, mass, mass customisation and continuous.
Why does the cost-per-part curve flatten?
Tooling is a fixed cost divided by the number of parts. A £20,000 tool adds £2,000 to each of ten parts and 2p to each of a million.
What is the hidden cost of batch production?
The set-up between batches: tools changed, machines reset, first parts scrapped. Fifty made ten times costs far more per unit than 500 made once.
Why does continuous production never stop?
Restarting a float glass line or a chemical plant costs more than running it, because the process must be brought back to temperature and the first output is scrap.
8.1.44 cards
Name the six factors influencing a manufacturing technique.
The type of part, the material, the scale of production, the production system available, cost constraints, and environmental considerations.
Which factor decides most often?
Scale, because it decides whether the tooling can be paid for — though a shape or a material the process cannot handle rules it out whatever the volume.
How is a conflict between scale and cost resolved?
Start with a cheaper process at lower volume, prove the market, then tool up — and write down the volume that triggers the change.
How does the production system influence the choice?
A factory uses what it has and what its people know, so it may machine a part a moulder would mould, or buy the moulded part in.
8.1.54 cards
What four things do you record for every part?
Its material, the process that made it, how it joins to the next part, and why each was chosen.
Why does the parts count matter?
It is the best single predictor of assembly time and cost. Fewer parts means fewer stations, less stock, fewer mistakes and usually lower impact.
What is line balancing?
Grouping work so each station takes about the same time. One station at 90 seconds among others at 30 sets the whole line to 90 seconds per unit.
Where should a test be placed?
Where the fault is cheapest to fix. Testing a board before it is sealed inside an enclosure costs minutes; afterwards it costs the whole product.
8.1.64 cards
Name four features injection moulding forces onto a design.
Draft angles so the part releases, uniform wall thickness so it cools without sinking, radii instead of sharp internal corners, and no undercuts.
What is a split line and why does it matter?
The line where the two halves of the tool meet, which cannot be avoided. A designer chooses where it runs so it looks deliberate rather than like a fault.
How does an assembly line shape a product?
Parts are designed so they fit only one way round and the product assembles from one direction — which is why so many products have all their screws on one face.
Why do product families share a colour palette?
Colour changes mean a machine changeover and wasted material, so colours are run in batches from a limited range.
Topic 8.1 study notes
Full notes & explanations for Production systems
Design Technology exam skills
Paper structures, command terms & tips
Want smart review reminders?
Sign up free to track your progress. Our spaced repetition algorithm will tell you exactly which cards to review and when.
Start Free