Back to Topic 12.5 — Korea (1840–1945)
12.5.3History (2028+) HL12 flashcards

Korea — Japanese colonial rule and wartime impact

Practice Flashcards

Flip to reveal answers
Card 1 of 1212.5.3
12.5.3
Question

When did Japan formally annex Korea?

Click to reveal answer

Track your progress — Sign up free to save your progress and get smart review reminders based on spaced repetition.

All 12 Flashcards — Korea — Japanese colonial rule and wartime impact

Sign up free to track progress and get spaced-repetition review schedules.

Card 1definition

Question

When did Japan formally annex Korea?

Answer

1910 — the final step after Korea had already been a Japanese protectorate since the Eulsa Treaty of 1905.

Card 2process

Question

What was the Land Survey (1910-1918) and its main effect?

Answer

A colonial land-registration programme; many Korean peasants could not prove ownership under its rules, so land passed to the state and Japanese settlers, creating mass tenant farming.

Card 3concept

Question

What triggered the timing of the March First Movement in 1919?

Answer

Wilson's idea of self-determination at the Paris Peace Conference, plus the funeral of former Emperor Gojong, gave nationalists an opportunity and hope of international support.

Card 4example

Question

How did Japan respond to the Samil Movement, and with what result?

Answer

Violent suppression — thousands killed, tens of thousands arrested — but it also pushed Japan into a softer 'Cultural Policy' in the 1920s.

Card 5definition

Question

What was Japan's 'Cultural Policy' of the 1920s?

Answer

A temporary relaxation of colonial control (e.g. allowing some Korean-language newspapers) introduced after the Samil Movement, later reversed in the 1930s.

Card 6definition

Question

What was Naisen Ittai and Sōshi-kaimei?

Answer

Naisen Ittai was the 1930s-40s doctrine that Japan and Korea were 'one body'; Sōshi-kaimei (1939-40) was the policy forcing Koreans to adopt Japanese names, part of forced assimilation.

Card 7concept

Question

How did the Second Sino-Japanese War (from 1937) change colonial rule in Korea?

Answer

It turned Korea into a total-war resource base: forced labour, military conscription (from 1944), requisitioned rice and metal, and the 'comfort women' system.

Card 8definition

Question

What was the 'comfort women' system?

Answer

A Japanese military system that forced tens of thousands of Korean and other women and girls into sexual slavery for soldiers — one of the most painful, contested legacies of occupation.

Card 9comparison

Question

Compare Kim Il Sung and Syngman Rhee during the occupation period.

Answer

Kim Il Sung: communist guerrilla commander against Japan in Manchuria, then based in the Soviet Union. Syngman Rhee: anti-communist, exiled mostly in the US lobbying for independence.

Card 10concept

Question

Why does the Kim Il Sung / Syngman Rhee rivalry matter for Korean history after 1945?

Answer

Their opposed ideologies and separate foreign backers (USSR vs US) meant Korea had no unified independence leadership ready in 1945 — a direct root of the peninsula's later division.

Card 11example

Question

How did Japan's surrender in August 1945 actually come about?

Answer

Through the atomic bombings and Soviet entry into the war against Japan — not through Korean resistance defeating Japan, leaving Korea liberated but unprepared and divided.

Card 12concept

Question

What is the key debate over Japanese colonial 'development' in Korea?

Answer

Whether infrastructure and administrative modernisation counted as real benefit, versus extraction that served Japan's interests while Korean ownership, profit, and control were lost.

Track your progress with spaced repetition

Sign up free — Aimnova tells you exactly which cards to review and when, so you remember everything before your IB exam.

Start Free